Bulletin for the Procurement Tender of Maintenance Management Equipment in Xingan League from Line S101 Line Holling Hower to A Leader Road (Secondary)

The territory of the S101 line from the Horingguole to the Adriatic first-grade highway Xinganmeng (herein referred to as "the project") has been approved by the Inner Mongolia Development and Reform Commission within the No. 2 No. [2011] document issued by the Development and Reform Commission for approval. The document No. 406 [2013] was approved by the Ministry of Transport of Inner Mongolia Autonomous Region for approval. The tenderee (project owner) is the construction and management office of the project of the S101 line from Huolin Gol to Alderdale. The construction fund comes from state subsidies, coalition self-raising and bank loans. The amount of the tender is about RMB 16.878 million. The project has already met the tendering conditions. Since the HAXSB-1 contract package for the maintenance of the project failed to be purchased for the first time in the domestic public bidding, the HAXSB-1 contract package is subject to the second tender and the bidder is qualified after the trial.

2. Project overview and scope of tender
2.1 Construction Standards and Scale: The starting point of the project is on the Baiyinhua-Huolingol-I first-class highway, via the Yicheng Coal Mine, the No. 4 Mine, Jinghu, Baofa Coal Mine, Ha-Yinura, Peachwood, and Allied The ranch, tree trenches, Yangjiatun, the end of the Adelaide, and the S203 line Ulanhot to zero road, the route length of 175.104 kilometers, of which 141.541 kilometers within the Xing'an League. The whole line is constructed according to the standard of two-way, four-lane first-class highway. The design speed of K0+000 to K39+052.82, K125+284.959 to K177+043 is 100 km/h, the width of roadbed is 26 meters, and the design speed of K39+052.82 to K125+284.959 is 80 Km/h, the width of the roadbed is 24.5 meters. With asphalt concrete pavement, the design load rating of bridges and culverts is Highway-I. There are 1 Tassar over-limit detection station, 1 Harishnoll toll station, 1 in Hazhnoor service area and maintenance area, 1 Tuilemao service area, 1 maintenance and repair area, and Taomumu toll station. In the ditch service area, there is 1 maintenance center and toll station of Alyde.
2.2 Bidding scope and division of the contract package: The HAXSB-1 contract package for procurement bidding for the maintenance management equipment of this project is shown in the following table:
Contract Package No. Device Name Unit Quantity
HAXSB-1 1 Life Cars (Pickups) Vehicles 9
2 Double Dump Trucks 9
3 Commuter vehicles (9 seats) 3
4 Commuters (19 persons) 3
5 Road Inspection Cars 3
6 Communication fee management vehicle 2
Note: 1, procurement equipment technical parameters see the tender announcement annex;
2. The delivery period is 30 days after signing the contract;
3. The place of supply shall be the maintenance work area, service area, super station, toll station or any other place designated by the bidder in Xingan League within the scope of the Line S101 line between Huolinguole and Adrieu.
3, bidder qualification requirements
3.1 The bidder shall be a manufacturer or its authorized distributor agency that is officially registered with the domestic industrial and commercial administrative department and has an independent legal personality and operates in accordance with the commercial regulations. The distributor agency shall provide the manufacturer's authorization or distribution certificate when bidding. Acting certificate or agency contract agreement; In the past three years (November 2013 to the deadline for bid submission), at least one successful contract package has been completed for the supply of one or more similar maintenance and management equipment.
3.2 The Commonwealth does not accept bids from the Consortium.
3.3 The successful bidder of the HAXSB-2 to HAXSB-4 contract package of this project shall not participate in this tender.
3.4 Affiliated companies with investment equity relations, or parent companies with direct management and managed relationships, or subsidiaries of the same parent company, or legal representatives of the same person, two or more legal persons may not submit bids for the same contract package at the same time , otherwise it will be treated as invalid bid.
3.5 The same type of equipment of the same brand accepts only one manufacturer or one of its authorized distributor agencies, otherwise the relevant bids are invalid.
3.6 The bidder and the bidder's legal representative within the last 10 years (if the bidder's establishment time is less than 10 years, the start time of the bidder's inquiry deadline may be the company's establishment date, but the inquiry deadline of the legal representative of the bidder must meet 10 years. Can be separately queried) There must be no criminal record of bribery. The bidder shall provide the original copy of the "Report of the Enquiries on the Results of the Filing of Bribery Files by the Procuratorate" issued by the company's registered office or the location where the project is located for the bidder and the legal representative of the bidder for the past 10 years. In the provinces where the "Bribery Criminal Files Online Query Platform" was opened, the "information notification letter" provided by the bidder for downloading and printing on the prosecutor's website is deemed as the original.
4. Obtaining tender documents
4.1 All bidders are interested in participating in the bid, from December 15, 2016 to December 21, 2016 (excluding statutory public holidays and holidays), daily from 8:30 to 11:30 and from 14:30 to 17:30 (Beijing time, the same below)