Excavation Design and Monitoring Tender Notice for Foundation Excavation of Guangfeng Cigar Factory

The ex-work technology transformation project of Jiangxi Cigarette Industrial Co., Ltd. Guangfeng Cigarette Factory has been approved for construction. The project owner is Jiangxi Zhongyan Industrial Co., Ltd. (hereinafter referred to as the “Tenderee”), and entrusted to Jiangxi Tobacco China Tobacco Industrial Co., Ltd. Guangfeng. Supporting design and monitoring of excavation support for the ex-situ technology renovation project of cigarette factory was conducted through open bidding.

I. Project Overview:
1. Project name: design and monitoring of excavation support for the excavation technical renovation project of Guangfeng Cigarette Factory of Jiangxi Zhongyan Industrial Co., Ltd.;
3. Project investment: The total investment in foundation pit support is about 5 million yuan, and the project investment is about 1.06 million yuan;
4. Duration (service cycle) requirements:
(1) The design of foundation pit support from March 2017 to April 2017, including design drawings completed and approved by experts, with a design period of 40 calendar days;
(2) The monitoring of the foundation pit must be carried out from the construction of the foundation pit supporting construction unit to the completion of the backfill of the foundation pit. The service cycle must meet the actual construction requirements;
5. This project is a bid section.
Second, the scope of the tender:
The design and monitoring of the foundation pit support in the construction scope of the excavation technical renovation project of the Guangfeng Cigarette Factory of Jiangxi Zhongyan Industrial Co., Ltd. The total pit area is about 3845 square meters, and the excavation depth is about 6-8 meters. The design and monitoring of the foundation pit support mainly includes the following areas: the joint workshop pipeline room, the underground pipe gallery, the power center basement, and the sewage treatment station groundwater pool. . Specifically include the following:
1, pit support design part
1.1 According to the actual situation of the site and the construction plan of the basement to be constructed, etc., design the foundation pit support plan and submit the construction drawings of the foundation pit support. The design depth of the construction drawings shall meet the requirements of the current regulations and must be reviewed and reviewed by relevant administrative authorities and industry review units.
1.2 According to the specifications and design intentions and actual needs, formulate the earth excavation plans and measures, draw up plans and measures for dewatering of foundation pits, and prepare supporting documents such as foundation pit monitoring plans and measures.
1.3 Prepare budget estimates for foundation pit support works. On-site guidance and supervision of the construction of foundation pit support by the construction unit.
2. Foundation Pit Support Monitoring Section
2.1 Foundation pit monitoring point settings: (1) reference point; (2) top horizontal and vertical displacement monitoring point; (3) groundwater level monitoring point; (4) anchor cable stress monitoring point; (5) surrounding road settlement monitoring point .
2.2 Foundation pit monitoring work content: (1) Top horizontal displacement monitoring; (2) Top vertical displacement monitoring; (3) Deep horizontal displacement monitoring; (4) Groundwater level monitoring; (5) Anchor cable stress monitoring; (6) Surrounding road subsidence monitoring.
2.3 Coordinating the monitoring work with the relevant construction administrative department and supervision department of the administrative area where the project is located, applying for the examination and approval of the monitoring technology achievements, ensuring that the technical achievements can be approved by the relevant departments to ensure that the progress of the project will not be affected by the monitoring work. Completion acceptance.
2.4 Coordinating work with relevant units such as construction units, supervision units, design units, etc. related to the monitoring project.
Third, bidder qualification conditions:
1. The bidder shall be registered in accordance with law, have a valid business license, be qualified as a VAT general taxpayer, and be able to issue 6% VAT invoices.
2, qualification requirements:
(1) The foundation pit support design unit must have one of the following qualifications issued by the construction administrative department: ? Class I qualification for geotechnical engineering survey or Class A qualification for geotechnical engineering design; or Qualification.
(2) Foundation pit support monitoring units must have Class B and higher surveying and mapping qualifications issued by the National Bureau of Surveying and Mapping Geographical Information [the scope of business must include deformation (settlement) observations].
3. Performance of the company: The bidder has completed at least one foundation pit support project with a total pit area of ​​not less than 3,100 square meters for at least five years (November 1, 2011 to date of contract signing). The total area of ​​the foundation pit shall not be less than 3,100 square meters. (The above project may be the same contract).
4. The person in charge of the proposed project is required to: The proposed project leader must have the qualification of registered civil engineer (geotechnical), and the unit name on the certificate of registration is the same as the name of the bidder's unit;
5. In order to meet the requirements for submitting design plans for foundation pit support, the bidder should include at least one Class I registered structural engineer.
(6) The bidding agency (composite foundation pit support design unit) shall obtain the original copy of the notification of the entry and exit of bids submitted by the construction administrative department of Jiangxi Province before the bid opening;
7. This project accepts bids from the Commonwealth. If the consortium participates in the bidding, the consortium can only be composed of the two sides of the foundation pit support design unit and the foundation pit support monitoring unit, and the consortium leader must be the foundation pit support design unit. A consortium agreement shall be attached to clarify the rights and obligations of the parties to the consortium. A consortium made up of units of the same profession determines the level of qualification according to the unit with the lower level of qualification.
Fourth, the tender documents obtained:
From December 14, 2016 to December 20, 2016 (excluding legal holidays, statutory holidays), daily from 9:00 to 12:00 and 14:00 (Beijing time, the same below)

KNB1-100 Miniature Circuit Breaker

KNB1-100 Mini Circuit breakers, also named as the air switch which have a short for arc extinguishing device. It is a switch role, and also is a automatic protection of low-voltage electrical distribution. Its role is equivalent to the combination of switch. Fuse. Thermal Relay and other electrical components. It mainly used for short circuit and overload protection. Generally, According to the poles, mini Circuit breaker can be divided into 1P , 1P+N , 2P, 3P and 4P.


KNB1-100 Miniature Circuit Breaker,Electronics Miniature Circuits Breaker,Automatic Miniature Circuit Breaker,Mini Circuit Breaker

Wenzhou Korlen Electric Appliances Co., Ltd. , https://www.korlen-electric.com

This entry was posted in on