Inner Mongolia 4 UHV lines to be approved

Inner Mongolia 4 UHV lines to be approved
At the National Energy Work Conference in 2014, it proposed to plan and construct 12 power transmission channels from Inner Mongolia to Tianjin, including four power transmission channels in Inner Mongolia.
In 2014 National "Two Conferences", Liang Tiecheng, deputy to the National People's Congress and director of the Development and Reform Commission of the autonomous region, disclosed that among the power transmission routes planned by the National Energy Administration, four extra-high-pressure tunnel projects from Inner Mongolia have passed the National Development and Reform Commission and the Energy Bureau. The discussion will be conducted before the State Council approves the preparatory work.
If Inner Mongolia’s 4 UHV lines are approved, Inner Mongolia will not be able to deliver electricity for a long period of time and will take this opportunity to ease.
Although Inner Mongolia is a large energy province, although there is abundant wind energy, due to the poor power transmission channels, electricity is not delivered, and over 30% of thermal power is idle. The wind-wind rejection rate is as high as 20% to 30%.
It is understood that the first phase of the country’s proposal is to build four UHVs in Inner Mongolia: Ximeng-Shandong, Ximeng-Jiangsu, Mengxi-Shandong, and Mengxi-Tianjin. The four UHV transmission capacities are 31 million kilowatts. Supporting electric power installed capacity is 42 million kilowatts, including 6 million kilowatts of wind power installed capacity, which is an increase in the proportion of clean energy used in the electricity-receiving regions, which will greatly help the management of haze in related regions.
Liu Bo, a staff member of the Renewable Energy Development Leading Group Office of the Chayouzhong Banner in Wulanchabu City, told the reporter: “The Zayouzheng Banner has very rich wind resources, and the problem of 'sending out and delivering' has also plagued us. After the approval of the four UHV lines, it is believed that this problem must be alleviated."
Shu Yudong, director of the integrated department of Inner Mongolia Huadian Huitengxile Wind Power Co., Ltd., said that at present, wind power in Inner Mongolia can be described as difficult. Now many wind power companies are idle, and the UHV line will help improve the situation in Inner Mongolia where electricity can not be delivered. However, due to too much idle electricity in Inner Mongolia, it needs to be improved gradually.
However, Yu Guangjun, director of the Institute of Economic Research at the Inner Mongolia Academy of Social Sciences, said that Inner Mongolia is building an extra-high line in its energy export base. This is an important part of the project. After construction, it will alleviate the phenomenon of litter, but a series of problems after approval is also worthwhile. Concerned.

Countdown Timer

FUNCTION DESCRIPTION

Countdown socket has an AC outlet, the maximum can output 230 V16A of power, there are two control modes, that is, countdown off and countdown on. It is convenient to control the equipment which needs to switch off or turn on AC. improve the safety of the use of some equipment and save more energy.


SET Timer

1,Countdown plug in the socket, all indicator lights red flash three times, at this time the socket has no output, for the normal state, into the countdown state. Click the button, the first red light up, the socket output after an hour off, and then short press the button can set the socket timing of 2 H.4H.6H.8H.10H.OFF.

2,Long press button 3s, all indicator lights green flash three times, at this time the socket has output, for the regular open state, into the countdown on state. Click on the button, the first green light on, the socket is closed an hour later, and then press the button to set the socket countdown 2 H.4H.6H.8H.10H.OFF.

3,Press button 3 longer S, all indicator lights red light flash 3 times again into countdown mode.

4,Select the required countdown time mode, the corresponding mode countdown lights up, start countdown until the end of the countdown time. The outlet that controls the output will start or stop the output.

5,After the countdown starts, the time indicator will change automatically from high to low until the countdown is over.

NOTE:

1,Check that the power connection is good.

2,Use only indoors and in dry places.

3,This product does not convert AC voltage.

4,Maximum load not exceeding 16A 3680W.

5,Grounding is required for safety.

6,Any questions, please contact the electrician.

countdown timer socket, countdown timer plug, Countdown digital timer, Countdown socket, countdown switch socket

NINGBO COWELL ELECTRONICS & TECHNOLOGY CO., LTD , https://www.cowellsocket.com

This entry was posted in on